Registration
Submit your information to be registered in our course
* Required

Casing and Cementing

 

 

Course Objective:

 

Participants will understand the limitations of various casing strings, casing preparation guide lines, running casing guide lines. Calculate the material requirements for a cementing operation. Calculate cement slurry volumes, job times, and mud returns. Trouble-shoot problems that may occur during cementing operations. Recommendations for performing a good cement job.

 

 

Course Contents:

 

Casing  

 

  • Purpose of casing.
  •  

  • Casing profiles and drilling scenarios.
  •  

  • Casing standards.
  •  

  • Casing properties.
  •  

  • Casing couplings.
  •  

  • Casing preparation guide lines.
  •  

  • Casing preparation per job check list.
  •  

  • Running casing guidelines.
  •  

  • Casing selecting depth. 
  •  

Cementing

 

  • Introduction. 
  •  

  • Cement slurries.
  •  

  • Typical field calculation.
  •  

  • Removal of drilling fluid.
  •  

  • Cement nomenclature.
  •  

  • Cement additives.
  •  

  • Principle compounds in Portland cement.
  •  

  • Physical properties of cement additives.
  •  

  • Successful cement job guide lines.
  •  

  • Standard equipment.
  •  

  • Cementing preparation per job check list.
  •  

  • General problems encountered during a cementing operation.
  •  

  • Casing and cementing analysis report.
  •  

 

Course duration: Five days

 

 

Who should attend?

 

Drilling Supervisors, Drilling Engineers, Tool Pushers, Senior Drillers and Drilling Superintendents, Mud engineer